First U.S. nuclear reactor built from scratch in decades enters commercial operation in Georgia::ATLANTA — A new reactor at a nuclear power plant in Georgia has entered commercial operation, becoming the first new American reactor built from scratch in decades.
South Australia is 70% renewables, as per their own official energy site.
Batteries are the limiting factor for renewables. Building battery storage that can supply a large city is expensive. Even the battery South Australia had Elon Musk build can only supply a town for about an hour. I’m hoping battery tech improves soon, but it seems to have stagnated for a while.
Ah sorry, my mistake. I messed up there.
The battery in SA is really just for grid stabilisation, not long term storage. Batteries are not really a good soln for longer duration storage. You need surprisingly little storage though when they’ve modelled fully renewable grids which is why the projected costs aren’t stupidly expensive.
That’s interesting, I’m an EE but in industry atm. I’d like to look into that whole scenario one day and see how much storage we’d need to go fully renewable.